The Two Tunnels scheme that connects the Bath Bristol cycleway through the Combe Down hill and beyond to Radstock is progressing well. In addition to two tunnels there are also two new bridges that need to be put in. These are at Monksdale and Millmead and they have both just been given planning permission. When this is complete it is going to be a fantastic ride from tyhe val;ley floor of Bath up the old rail line and through the Combe Down Tunnel.